Military Environmental Control Units (ECUs) from Fischer Panda UK

Get in Touch

Parallel Operation - Load Switching

Two Panda AC generators can be connected together to operate as one unit. This system does not feature full load-sharing capabilities for safety reasons and to keep the system simple to operate. The generators' output is synchronised and either combined or switched from one generator to the other. To increase operational safety both generators are shutdown if a system failure occurs.

parallel power load switching

This video demonstrates how electrical sources are switched/combined using two Fischer Panda generators depending on the current requirements for defence applications running varying loads.

Military & Defence Clients

 

LET US HELP CALCULATE YOUR GENERATOR REQUIReMENTS

Get Started

Powered by Intergage