Working on an electric or hybrid fishing vessel project?

 

The transition to electric and hybrid fishing vessels brings new opportunities, alongside practical questions around propulsion, battery capacity, charging, available space and onboard power requirements.

As a 2025 Green Innovator Award winner, Fischer Panda UK | Power Solutions brings experience in integrated marine power systems, working with project teams to assess the technical options and develop solutions around the vessel, its operating profile and the demands of commercial fishing.

 

Our team can help

With the Fisheries and Seafood Scheme (FaSS) offering funding opportunities for eligible projects in England, there is an opportunity to explore how electric and hybrid technology could support your next build or conversion. We can help identify the technical challenges, assess the available options and specify an integrated system that meets the vessel's operational requirements.

 

We work with boat builders, yards, marine engineers and project partners from early-stage feasibility and system design through to equipment supply and installation support, helping shape a practical solution around the vessel and its intended use.

 

Exploring funding through FaSS?

Lorna Jane ep

The Fisheries and Seafood Scheme (FaSS), administered by the Marine Management Organisation (MMO) on behalf of Defra in England, offers up to 90% grant contribution towards eligible electric or hybrid engine projects, regardless of vessel or business size. Funding is subject to the scheme's eligibility criteria and approval.

For fishing vessel operators considering a new build or conversion, this creates an opportunity to explore alternative propulsion. Yards, marine engineers and project partners can play an important role in assessing the technical options and developing a suitable system from the outset.

Fischer Panda UK | Power Solutions can support this early-stage process by working with you and your project team to:

  • Assess the vessel's operational requirements and technical constraints.
  • Explore suitable propulsion, battery storage and charging options.
  • Develop an integrated system design around the vessel and its intended use.
  • Provide technical information to help inform project planning and a funding application.

 

Involving us early can help establish the project's requirements, identify potential challenges and assess the available options before committing to a particular system. The necessary scheme approval must be in place before funded work begins.

Official Fisheries & Seafood Scheme guidance                                               FaSS funding for new engines and gearboxes


 

The right system

starts with the vessel

 

Every fishing vessel has its own requirements. Operating profile, range, working loads, available installation space and charging opportunities all influence the right approach.

Rather than starting with an individual product, we look at how the complete system needs to work.


 

More than an electric motor

Choosing electric propulsion involves more than selecting a motor. The system needs to be designed around how the vessel works, the distance it covers, its typical operating speeds, the equipment it carries and how it can recharge between trips.

Energy sources may include shore power, solar and, where appropriate, onboard generation. We work with our customers and project partners to bring the key elements together, helping to establish a practical system specification to suit the vessel's bespoke requirements.

FaSS - system diagram


 

Power in Practice

'Lorna Jane', the UK's first electric fishing vessel

Case study snapshot

A working fishing boat,

converted to electric power

 

When Scottish fisherman and boatbuilder Hans Unkles set out to electrify his fishing vessel, the goal was to create a system that could support the practical demands of commercial fishing, not simply demonstrate electric propulsion.

The Lorna Jane, a Cigma 21 originally built in 1979, was converted to solar and electric power using a Fischer Panda 20 kW pod motor, a 48 V battery system with 45 kWh capacity and solar panels. The installation was designed around the vessel's existing layout and working requirements.

The project illustrates why electric fishing vessel conversions need to be approached as complete system designs. Propulsion, stored energy, charging, onboard electrical loads and the realities of the working day all need to be considered together.

 

Visit the project's pages:

 

Website                                  Social media

ce47704182c4f779d7e1805a4165d34a361a6cfb

 

Read the full case study

pdf


 

How can WE support

 

We work alongside boatyards, marine engineers and other project partners to help develop and integrate the system around each vessel.

Our support can include:

  • Project assessment: understanding the vessel, its operating profile and the challenges to be addressed.
  • Electric and hybrid propulsion: exploring suitable propulsion options for new builds and conversions.
  • Battery systems: assessing energy storage requirements and system configuration.
  • Charging and onboard power: considering shore power, solar, onboard generation and the wider electrical loads.
  • System integration: bringing propulsion, storage, charging, power management and onboard equipment together.
  • Technical specification and project support: helping define the system and working with the wider project team as the design develops.
  • Installation, commissioning and aftersales: supporting the practical implementation and ongoing operation of the system, depending on the project scope.

Electric propulsion - schematic

A project-led approach

1 - FaSS - Understand

understand the vessel

Establish how the boat is used, the work it needs to perform, its operating range and any installation constraints.

 

2 - FaSS - Develop

DEVELOP the system

Assess propulsion, battery storage, charging and power management as one integrated installation.

 

3 - FaSS - Support

Support the project

We help refine the technical specification and provide relevant system and equipment support as the project progresses, working alongside the boatyard and other specialists.

 

4 - FaSS - Plan

Plan for the installation

As the project develops, we can support equipment supply, installation and commissioning arrangements, as agreed for the project.

 


 

Planning your next fishing vessel?

Whether you are considering a new build, an electric conversion or a hybrid system, we can work with you and your team to assess the requirements and explore the technical options.
 
We welcome enquiries from boatyards, marine engineers, naval architects and other project partners working on eligible or prospective fishing vessel projects.

This page is intended for marine professionals and project partners. FaSS eligibility and funding decisions are determined by the relevant scheme authorities. Fischer Panda UK can assist with technical discussions and project specification but does not guarantee grant approval.

Discuss a project with our marine team


 

SHOPToken

20

0

Launching our new E-Store

mastervolt-banner-grey

We have carefully selected a range of parts you'll need to keep your Power Solutions, Generators, Air conditioners and Watermakers running at optimal performance.

Visit Store